Linked is our traceability matrix.
02/23/23: Initial user needs defined.
03/05/23: Initial design inputs.
04/10/23: Initial acceptance criteria.
05/04/23: Finalized document.
BME 66 Pills
Linked is our traceability matrix.
02/23/23: Initial user needs defined.
03/05/23: Initial design inputs.
04/10/23: Initial acceptance criteria.
05/04/23: Finalized document.